Pest Response Log
One line per pest report, from the day the property learned of it to the inspection that closed it.
Prepared by Trenton S. Frazer, M.S., Board Certified Entomologist (BCE #B3413) · Version 1.0, October 13, 2026 · Not legal advice
Spreadsheet (.xlsx)Printable PDF
The columns follow the records that published court opinions, HUD's NSPIRE correction standard and federal auditors have looked for. Why each one is there: Pest Records That Hold Up.
The columns
| Column | What goes in it |
|---|---|
| Log # | Number each report in order. Never reuse or delete a number. |
| Date and time received | When the property first learned of it. |
| Source | Resident, staff, pest provider, neighboring unit, agency inspection. |
| Building / unit or area | |
| Pest reported | As described by the reporter. |
| Pest identified (species) | By whom; specimen or photo. |
| Inspected (date, by) | |
| Response | No pest found / treated / referred for repair / other. |
| Treatment dates and applicator license no. | One entry per treatment; the full application record is kept separately (in Utah, R68-7-11(11)). |
| Resident prep: instructions given / help requested / help arranged | Dates and a neutral description. |
| Adjacent units checked (units, dates, results) | Units sharing walls, floors or ceilings. |
| Building conditions reported (and closed) | Door gap, pipe gap, leak, sanitation; date closed. |
| Follow-up inspections (dates, results) | |
| Closure criterion met (date, by, basis) | From the IPM plan. Response time is not closure. |
| Agency finding / program note | NSPIRE deficiency, code notice, LIHTC finding; the written response. |
Three rules
- Write entries as things happen. Do not rewrite an earlier entry; add a dated correction on a new line.
- Keep the pest provider's application records and service reports with the log.
- A report stays open until the closure criterion in the IPM plan is met on a follow-up inspection.
Pest Response Log · Property: ____________________ · Page ____ · multifamilypestreference.org · Version 1.0, October 13, 2026
| Log # | Date and time received | Source | Building / unit or area | Pest reported | Pest identified (species) | Inspected (date, by) | Response | Treatment dates and applicator license no. | Resident prep: instructions given / help requested / help arranged | Adjacent units checked (units, dates, results) | Building conditions reported (and closed) | Follow-up inspections (dates, results) | Closure criterion met (date, by, basis) | Agency finding / program note |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Write entries as things happen. Do not rewrite an earlier entry; add a dated correction on a new line. Keep the pest provider's application records and service reports with the log. A report stays open until the closure criterion in the IPM plan is met on a follow-up inspection.